Back to Blog
    Standards & Verification
    11 min read

    Verification Preparation Before Year End: 4 Practical Tips

    Preparing for emission inventory verification before it piles up at year end speeds up the process.

    Founder, SBTi Certified Expert20 November 2023
    Calendar and planning

    Verification Preparation Before Year End: 4 Practical Tips

    Many companies leave emission inventory verification until year end. This situation both creates pressure on the team and extends the verification process. The year-end busyness of verification organizations makes scheduling appointments difficult and the process takes longer.

    Verification tests the reliability of the system, not the accuracy of the calculation. Where did the data come from, how was it processed, what controls were applied? Providing clear answers to these questions speeds up the verification process and reduces finding risk.

    In this article, we cover in detail four fundamental tips that systematize verification preparation. For each tip, we provide practical templates and checklists.

    Tip 1: Organize data files

    Raw data, calculation, and results should be in separate tabs. Formulas should be visible and traceable. The verifier should be able to start from any point and trace back to the source document.

    Main folder structure:

    • 00_Inventory_Report/
    • 01_Raw_Data/
    • 02_Calculation_Files/
    • 03_Emission_Factors/
    • 04_Supporting_Documents/
    • 05_Internal_Control/
    • 06_Verification_Communication/

    01_Raw_Data subfolders:

    • Energy_Bills/
    • Fuel_Records/
    • Production_Data/
    • Transportation_Records/
    • Waste_Reports/
    • Business_Travel/

    File naming standard: YYYY_CategoryCode_DataType_Version.xlsx Example: 2024_Scope2_Electricity_v3.xlsx

    Calculation file tab structure:

    1. Cover (inventory summary, date, version)
    2. Raw Data (with source references)
    3. Conversions (unit conversions, intermediate calculations)
    4. Emission Factors (with source and year information)
    5. Calculation (with visible formulas)
    6. Results (summary tables)
    7. Assumptions and Notes (list of all assumptions)

    Traceability rules:

    • No cell should contain "hard-coded" values (without source reference)
    • Formulas should not be hidden
    • Each row should have a source reference
    • Intermediate calculations should not be deleted

    Supporting files prepared for verifiers

    • Organization boundary diagram (which facilities are included)
    • Process flow diagram (emission sources)
    • Data collection procedure
    • Emission factor selection justification
    • Recalculation policy

    Tip 2: List emission factor sources

    Which factor from which source, which year? This list should be ready. The verifier questions the selection rationale for each factor.

    Emission factor documentation template

    The following information should be recorded for each emission factor:

    FieldExample
    Emission sourceNatural gas combustion
    Factor value0.202 kg CO2e/kWh
    SourceDEFRA 2024
    Geographic scopeUnited Kingdom
    Technological scopeGeneral natural gas
    Factor year2024
    GWP referenceIPCC AR5
    ScopeScope 1 (combustion)
    WTT/TTW/WTWTTW (tank-to-wheel)
    Selection justificationSpecific factor not available for Turkey, DEFRA is most current and reliable source
    Alternative sourcesIPCC, IEA, Turkey NIR
    Update dateJanuary 2024

    Factor hierarchy

    GHG Protocol recommends the following hierarchy for factor selection:

    1. Primary data: Specific factor from supplier or manufacturer
    2. National factor: Turkey National Inventory Report (NIR) or official source
    3. Regional factor: EU or regional databases
    4. International factor: IPCC, DEFRA, EPA, IEA
    5. Default value: IPCC default values as last resort

    At each stage, if a higher-tier factor is not available, the reason is explained before moving to the lower tier.

    Common factor errors

    • Confusing location-based and market-based factors for electricity
    • Confusing WTT (well-to-tank) and TTW (tank-to-wheel) factors
    • Using factors from different years in the same inventory
    • Inconsistent use of GWP reference (AR4, AR5, AR6)

    Tip 3: Document exclusions

    Which sources are excluded and why? Justifications should be clearly written. GHG Protocol requires exclusions to be justified.

    GHG Protocol exclusion rules

    GHG Protocol Corporate Standard allows exclusions under the following conditions:

    De minimis:

    • If a source accounts for less than 1% of total emissions, it can be excluded
    • All exclusions combined should not exceed 5%
    • Justification should be documented in all cases

    Data unavailability:

    • If data cannot be obtained with reasonable effort, it should be explained
    • Data collection plan for future periods should be stated
    • Estimated impact should be reported

    Exclusion documentation template

    Excluded sourceJustificationEstimated impact (%)Future plan
    Office suppliesLess than 0.5% of total emissions0.3%Will be included in 2025
    Small warehouses (<100 m²)Data not obtainable, 3 locations0.8%Data will be collected in 2025
    Employee commuting (K7)Survey not completed~2%Survey will be conducted in 2025 Q1

    Verifier expectations

    Verifiers ask these questions:

    • Where is the list of excluded sources?
    • Has the estimated impact of each been calculated?
    • How was the materiality threshold determined?
    • Will they be included in scope in future periods?

    Being prepared for these questions speeds up the verification process.

    Tip 4: Run internal control process

    Internal review should be conducted before verification. Having someone else check the file catches errors early. Internal control is like a "dress rehearsal" for external verification.

    Internal review checklist

    Data integrity checks:

    • Does raw data match source documents?
    • Are unit conversions correct?
    • Are there errors in formulas?
    • Does total = sum of sub-items?
    • Does it make sense compared to last year?

    Documentation checks:

    • Is the source of each data item specified?
    • Are emission factor references complete?
    • Are assumptions documented?
    • Are exclusions justified?
    • Is organization boundary clearly defined?

    Methodology checks:

    • Is consolidation approach consistent?
    • Scope 2: Is location-based and market-based distinction correct?
    • Are Scope 3 categories correctly classified?
    • Has base year recalculation policy been applied?

    Format and presentation checks:

    • Is report format compliant with standards?
    • Are charts and tables consistent?
    • Is rounding consistent?
    • Are units clearly specified?

    Timeline planning

    Recommended timeline for verification:

    WeekActivity
    -8Data collection completed
    -6Calculations completed
    -5Internal review begins
    -4Internal review completed, corrections made
    -3Files sent to verification organization
    -2Verification organization conducts desktop review
    -1Site visit or remote interview
    0Draft findings received
    +1Corrections made
    +2Final verification statement received

    Common findings from verifiers

    According to our experience, the most frequently encountered verification findings are:

    Major findings:

    • Organization boundary not documented
    • Exclusions not justified
    • Emission factor source not specified
    • Data trail cannot be followed (raw data → result)

    Minor findings:

    • Rounding inconsistency in some calculations
    • Factor year doesn't match reporting year
    • Small mathematical errors
    • Missing explanations

    Improvement recommendations:

    • Conduct data quality assessment
    • Add uncertainty analysis
    • Develop recalculation policy

    Preparing for site visit

    If the verifier will conduct a site visit:

    • Be ready to show meter readings
    • Prepare fuel stock records
    • Compile waste disposal documents
    • Be ready to explain the data entry process
    • Inform relevant personnel

    Completing these steps before year end significantly facilitates the verification process and minimizes finding risk.

    Tags

    doğrulama
    envanter
    hazırlık
    yıl sonu

    Cookie Usage

    We use cookies to improve your experience on our website. By continuing to use the site, you accept our use of cookies. Privacy Policy