All Sectors

    GHG Inventory Boundary for Cement

    A practical guide to help your company determine minimum inventory scope per GHG Protocol

    Clinker productionGrinding plantReady-mix concreteAggregateAlternative fuel/waste co-firing
    Minimum Boundary
    Minimum areas to be included per GHG Protocol

    Scope 1 (Direct Emissions)

    • Calcination (process CO2)
    • Kiln fuel combustion
    • Mobile equipment fuel

    Scope 2 (Indirect Energy Emissions)

    • Grinding electricity consumption
    • Auxiliary equipment (fan, compressor)
    • Lighting/site

    Dual Reporting: Location-based uses regional grid emission factors; market-based uses contractual factors (I-RECs, PPAs). Both approaches must be reported.

    Scope 3 (Value Chain Emissions)

    Cat 1: Purchased Goods and ServicesCat 2: Capital GoodsCat 3: Fuel- and Energy-Related ActivitiesCat 4: Upstream Transportation and DistributionCat 5: Waste Generated in OperationsCat 9: Downstream Transportation and DistributionCat 10: Processing of Sold ProductsCat 12: End-of-Life Treatment of Sold Products
    Top 10 Pitfalls
    • 1Not properly managing clinker/cement ratio (clinker factor)
    • 2Confusing process emissions with fuel (calcination should be separate)
    • 3Incorrectly classifying biogenic content/waste fuel
    • 4Making market-based claims for electricity without documentation
    • 5Forgetting packaging and additives in Cat1
    • 6Writing Cat4/9 transport with wrong boundary (Incoterms)
    • 7Confusing product processing (Cat10) with use (Cat11)
    • 8Assuming single rate for EoL (Cat12) instead of country-specific rates
    • 9Missing inter-facility transfers
    • 10Matching production data with emission data from different periods

    Priority Categories

    8 categories
    Sector Examples (5 scenarios)
    Real-life example scenarios

    Integrated facility with clinker production line

    Relevant: Scope 1 + Scope 2 + Cat1/3/4/5/9

    Data: fuel (L), production (tonnes), electricity (kWh), supply (tonnes)

    Approach: scope1 process+combustion + Cat1 hybrid

    clinker factor and biogenic share

    Grinding-only facility (clinker from outside)

    Relevant: Scope 2 heavy + Cat1 critical

    Data: kWh, clinker tonnes, additives

    Approach: Cat1 supplier-specific target

    clinker supplier's boundary

    Ready-mix concrete production

    Relevant: Cat1 (cement, aggregate) + Cat4/9 (logistics)

    Data: m3 concrete, cement kg, shipment km

    Approach: average-data + top suppliers hybrid

    aggregate transportation hotspot

    Kiln operation with alternative fuels

    Relevant: Scope 1 + Cat3

    Data: AFR composition + LHV

    Approach: fuel-based

    biogenic/fossil separation

    Export-heavy sales

    Relevant: Cat9 logistics

    Data: tonne-km sea

    Approach: average-data

    incoterms delivery point

    FAQ for Cement

    This content is for informational purposes. Your company's reporting scope may expand based on operational reality, reporting standards, assurance requirements, stakeholder expectations, and regulations.

    Need Professional Support?

    Contact us for expert support on GHG inventory calculation and boundary setting.

    Cookie Usage

    We use cookies to improve your experience on our website. By continuing to use the site, you accept our use of cookies. Privacy Policy